Note
Go to the end to download the full example code.
Creating a time-distance plot from a sequence of maps#
This example showcases how you can use sunpy.map.pixelate_coord_path()
and sunpy.map.sample_at_coords() on a sequence of images to create a
time-distance diagram accounting for solar differential rotation using
sunpy.coordinates.propagate_with_solar_surface() and dealing with off-disk
pixels using sunpy.coordinates.screens.SphericalScreen()
import matplotlib.dates as mdates
import matplotlib.pyplot as plt
import numpy as np
import astropy.units as u
from astropy.coordinates import SkyCoord
import sunpy.map
from sunpy.coordinates import propagate_with_solar_surface
from sunpy.coordinates.screens import SphericalScreen
from sunpy.map import pixelate_coord_path, sample_at_coords
from sunpy.net import Fido
from sunpy.net import attrs as a
First, we will need to acquire a sequence of images from SDO/AIA. We will use a data from 2012 containing a nice example of loop oscillations.
For the online documentation, the time range specified here is kept short, but you can expand the time range to 18:05 - 18:30 to see more of the oscillations.
query = Fido.search(
a.Time('2012-10-20 18:14:00', '2012-10-20 18:19:00'),
a.Instrument.aia,
a.Wavelength(171*u.angstrom),
)
files = Fido.fetch(query, site="NSO")
files = sorted(files)
Our target will be a set of loops in the corona above an active region. First load the FITS files we downloaded above into map sequence and divide by the exposure time. We then create a rectangular submap or cutout around the area of interest. We will also define the path, in this case a line, along which we want to make the time-distance plot.
aia_seq = [aia_map / aia_map.exposure_time for aia_map in sunpy.map.Map(files)]
corner = SkyCoord(Tx=-1150*u.arcsec, Ty=-500*u.arcsec,
frame=aia_seq[0].coordinate_frame)
ref_sub_map = aia_seq[0].submap(corner, width=250*u.arcsec, height=450*u.arcsec)
line_coords = SkyCoord([-1030, -1057]*u.arcsec, [-220, -206]*u.arcsec,
frame=aia_seq[0].coordinate_frame)
Next we can plot the full disk map, over-plotting the region of interest and also plot the submap and the line along which we want to make the time-distance plot.
fig = plt.figure(figsize=(9, 5))
full_disk_ax = fig.add_subplot(121, projection=aia_seq[0])
aia_seq[0].plot(axes=full_disk_ax, clip_interval=[1, 99.9]*u.percent)
ref_sub_map.draw_extent(axes=full_disk_ax)
sub_map_ax = fig.add_subplot(122, projection=ref_sub_map)
ref_sub_map.plot(axes=sub_map_ax, clip_interval=[1, 99.9]*u.percent)
sub_map_ax.plot_coord(line_coords)

[<matplotlib.lines.Line2D object at 0x71af0a4fc2d0>]
There are two approaches that can be used to extract time distance measurements from the data:
Reproject all the maps to a common world coordinate system (WCS)
Transform the coordinates of the line extracted from the reference map to the coordinate systems of the subsequent maps
We will use both and show they achieve almost the same results. Choosing which approach to use will depend on the exact use case.
We will start with the first approach and reproject all the maps to a common WCS
defined by ref_sub_map.wcs while also taking account of differential rotation
using propagate_with_solar_surface() and off-disk pixels
using SphericalScreen().
reprojected_sub_maps = []
for cur_map in aia_seq:
with (propagate_with_solar_surface(),
SphericalScreen(cur_map.observer_coordinate, only_off_disk=True)):
reprojected_sub_maps.append(cur_map.reproject_to(ref_sub_map.wcs, preserve_date_obs=True))
Now that we have reprojected all the maps to a common WCS, we can extract the
pixel coordinates once using pixelate_coord_path() to
determine the coordinates for every pixel that intersects with the physical
path and then use sample_at_coords() to sample the data at
these coordinates.
# As the maps are all aligned only need to extract the coordinates once
intensity_coords = pixelate_coord_path(aia_seq[0], line_coords)
intensities_reproject = []
for aia_map in reprojected_sub_maps:
intensities_reproject.append(sample_at_coords(aia_map, intensity_coords))
For the second approach we need to transform the intensity_coords into
the coordinate frame of each map and then extract the data at corresponding
pixel coordinates.
intensities_transform = []
for cur_map in aia_seq:
with (propagate_with_solar_surface(),
SphericalScreen(cur_map.observer_coordinate, only_off_disk=True)):
# The coordinate will automatically be transformed into the cur_map frame
intensities_transform.append(sample_at_coords(cur_map, intensity_coords))
Now that we have obtained the raw data, we need to prepare it for plotting and calculate the extents of the x and y axes for the final plot.
# The above will give us a list of 1D arrays, one for each map in the sequence.
# We need to stack them into a 2D array.
intensities_reproject = np.stack(intensities_reproject, axis=1).value
intensities_transform = np.stack(intensities_transform, axis=1).value
# This defines the distance along the path in arcseconds.
angular_separation = intensity_coords.separation(intensity_coords[0]).to(u.arcsec)
# Get correct values for the extent
extent = [reprojected_sub_maps[0].date.datetime, reprojected_sub_maps[-1].date.datetime,
0, angular_separation[-1].value]
Plot the reference submap, line and extracted data from both approaches and the difference between them.
fig = plt.figure(figsize=(10, 5), layout="constrained")
left, right = fig.subfigures(nrows=1, ncols=2, width_ratios=[0.6, 0.75])
left_ax = left.add_subplot(111, projection=reprojected_sub_maps[0])
right_ax = right.subplot_mosaic([['repro'], ['trans'], ['diff']],
sharex=True, sharey=True)
imag_ax = reprojected_sub_maps[0].plot(axes=left_ax, clip_interval=[1, 99.9]*u.percent)
plt.colorbar(imag_ax, ax=left_ax)
left_ax.plot_coord(line_coords)
right_ax['repro'].imshow(
intensities_reproject, aspect='auto', interpolation='none',
extent=extent, cmap=imag_ax.get_cmap()
)
plt.colorbar(right_ax['repro'].images[0], ax=right_ax['repro'])
right_ax['trans'].imshow(
intensities_transform, aspect='auto', interpolation='none',
extent=extent, cmap=imag_ax.get_cmap()
)
plt.colorbar(right_ax['trans'].images[0], ax=right_ax['trans'])
right_ax['diff'].imshow(
intensities_reproject - intensities_transform, interpolation='none',
aspect='auto', extent=extent, cmap='bwr'
)
plt.colorbar(right_ax['diff'].images[0], ax=right_ax['diff'])
locator = mdates.AutoDateLocator(minticks=4)
formatter = mdates.ConciseDateFormatter(locator)
right_ax['diff'].xaxis.set_major_locator(locator)
right_ax['diff'].xaxis.set_major_formatter(formatter)
right_ax['diff'].xaxis.set_minor_locator(mdates.MinuteLocator())
right_ax['repro'].set_title('Reproject approach')
right_ax['trans'].set_title('Transform approach')
right_ax['diff'].set_title('Difference between the approaches')
right_ax['diff'].set_xlabel('Time [UTC]')
right_ax['trans'].set_ylabel('Distance [arcsec]')
plt.show()